Studio
King Alfred School
To encourage and develop health and fitness the school required a studio with flexibility for a broad range of other events and activities. The new building is both individual and sits alongside the existing school buildings, with lower than average construction costs. The three phase construction programme was planned around the school holidays: foundations during Easter; floor slab and retaining wall during half term; main building during the summer break. Constructed was by the school's contractor, a team of two craftsmen.